Install EV Chargers in Methuen, Massachusetts

Install EV chargers or analyze a site in Methuen, Massachusetts. 16 existing public charging locations (5 DC fast, 11 Level 2). Free 0–100 profitability score on any Methuen address from EV Data Map by Charge Rigs.

Methuen, Massachusetts is served by 16 public electric vehicle charging locations operating 48 individual chargers — an average of 3.0 chargers per site. Of those locations, 5 (31%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (69%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Methuen is ChargePoint Network with 13 locations, followed by RED_E with 1. Average DC fast power across the city is approximately 269 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Methuen and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Methuen

Methuen, Massachusetts boasts a strategic landscape for EV charging, featuring 16 public locations dominated by the ChargePoint Network, which operates 81% of these sites. Notably, 31% of charging options are DC fast stations, delivering an impressive average of 269 kW, with the fastest stalling at 400 kW. This concentration of high-powered, ultra-fast charging—80% of DC fast sites are at least 150 kW—creates a competitive edge for new operators looking to enter the market. The balance between these rapid chargers and 11 Level 2 stations caters to varying driver needs, highlighting Methuen's potential for growth in both speed and accessibility in the EV infrastructure landscape.

Methuen charging by the numbers

Locations
16
Chargers
48
DC Fast locations
5
Level 2 locations
11

DC fast share: 31% of locations. Level 2 share: 69%. Average chargers per site: 3.0. Average DC fast power: 269 kW.

Methuen charging — local snapshot

Top operator share
ChargePoint Network runs 81% of public locations across 4 networks.
Average DC fast power
269 kW (fastest stall: 400 kW)
High-power share
80% of DC fast sites are 150 kW-class or higher
Mix
31% DC fast / 69% Level 2 across 16 locations
Estimated DC ports
26 fast-charging ports city-wide

Charging networks in Methuen

The following operators run public charging in Methuen, ranked by number of locations.

Featured charging locations in Methuen

A selection of higher-power public charging locations across Methuen, sorted by power level.

  1. Methuen MB.HPC — Methuen, MA, 01844 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Target - Tesla Supercharger — Methuen, MA, 01844 (Tesla · DC Fast · 325 kW)
  3. CITY OF METHUEN PARK & RIDE 2 — Methuen, MA, 01844 (ChargePoint Network · DC Fast · 250 kW)
  4. CITY OF METHUEN PARK & RIDE 1 — Methuen, MA, 01844 (ChargePoint Network · DC Fast · 250 kW)
  5. Georges Bakery Sunshine Foods — Methuen, MA, 01844 (RED_E · DC Fast · 120 kW)
  6. NEIGHBORHOOD STATION1 — Methuen, MA, 01844 (ChargePoint Network · Level 2 · 6.5 kW)
  7. CITY OF METHUEN HIGH SCHOOL 1 — Methuen, MA, 01844 (ChargePoint Network · Level 2 · 6.5 kW)
  8. SONNY VALLEY STATION 4 — Methuen, MA, 01844 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CITY OF METHUEN SEARLES 1 — Methuen, MA, 01844 (ChargePoint Network · Level 2 · 6.5 kW)
  10. SONNY VALLEY STATION 5 — Methuen, MA, 01844 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITY OF METHUEN HIGH SCHOOL 2 — Methuen, MA, 01844 (ChargePoint Network · Level 2 · 6.5 kW)
  12. SONNY VALLEY STATION 2 — Methuen, MA, 01844 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Methuen specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Methuen, Massachusetts?
There are 16 public electric vehicle charging locations in Methuen, Massachusetts, with a combined 48 individual chargers. 5 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Methuen?
ChargePoint Network operates the most public charging locations in Methuen with 13 sites, followed by RED_E with 1 sites.
How much does it cost to install an EV charger in Methuen?
Level 2 EV chargers in Methuen typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Methuen?
Most Methuen projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Methuen?
A typical commercial Level 2 installation in Methuen energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Methuen take to become profitable?
Payback in Methuen depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage