Install EV chargers or analyze a site in Methuen, Massachusetts. 16 existing public charging locations (5 DC fast, 11 Level 2). Free 0–100 profitability score on any Methuen address from EV Data Map by Charge Rigs.
Methuen, Massachusetts is served by 16 public electric vehicle charging locations operating 48 individual chargers — an average of 3.0 chargers per site. Of those locations, 5 (31%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (69%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Methuen is ChargePoint Network with 13 locations, followed by RED_E with 1. Average DC fast power across the city is approximately 269 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Methuen and receive an instant ROI score, demand projection, and recommended charger configuration.
Methuen, Massachusetts boasts a strategic landscape for EV charging, featuring 16 public locations dominated by the ChargePoint Network, which operates 81% of these sites. Notably, 31% of charging options are DC fast stations, delivering an impressive average of 269 kW, with the fastest stalling at 400 kW. This concentration of high-powered, ultra-fast charging—80% of DC fast sites are at least 150 kW—creates a competitive edge for new operators looking to enter the market. The balance between these rapid chargers and 11 Level 2 stations caters to varying driver needs, highlighting Methuen's potential for growth in both speed and accessibility in the EV infrastructure landscape.
DC fast share: 31% of locations. Level 2 share: 69%. Average chargers per site: 3.0. Average DC fast power: 269 kW.
The following operators run public charging in Methuen, ranked by number of locations.
A selection of higher-power public charging locations across Methuen, sorted by power level.
Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Methuen specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.