Install EV Chargers in North Andover, Massachusetts

Install EV chargers or analyze a site in North Andover, Massachusetts. 10 existing public charging locations (0 DC fast, 10 Level 2). Free 0–100 profitability score on any North Andover address from EV Data Map by Charge Rigs.

North Andover, Massachusetts is served by 10 public electric vehicle charging locations operating 23 individual chargers — an average of 2.3 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in North Andover is ChargePoint Network with 8 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in North Andover and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in North Andover

North Andover, Massachusetts, presents a unique opportunity for EV charging infrastructure development due to its complete lack of DC fast charging stations, with all 10 public locations providing only Level 2 charging. This dominance by Level 2 chargers means that local EV drivers are currently underserved for quick charging options, creating a substantial gap in the market. ChargePoint Network operates 80% of these sites, essentially centralizing the region's charging capabilities and highlighting the need for diverse operator competition. As drivers seek efficient solutions for rapid charging, this presents a prime opportunity for site developers to introduce DC fast charging infrastructure, catering to the increasing demand from the community and neighboring areas.

North Andover charging by the numbers

Locations
10
Chargers
23
DC Fast locations
0
Level 2 locations
10

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.3. Average DC fast power: 0 kW.

North Andover charging — local snapshot

Top operator share
ChargePoint Network runs 80% of public locations across 3 networks.
Mix
0% DC fast / 100% Level 2 across 10 locations

Charging networks in North Andover

The following operators run public charging in North Andover, ranked by number of locations.

Featured charging locations in North Andover

A selection of higher-power public charging locations across North Andover, sorted by power level.

  1. ReVision Energy — North Andover, MA, 01845 (Non-Networked · Level 2 · 7.2 kW)
  2. 45 Beechwood LLC - TEP — North Andover, MA, 01845 (CHARGESMART_EV · Level 2 · 7.2 kW)
  3. HIGH ST. LOT RCG LLC — North Andover, MA, 01845 (ChargePoint Network · Level 2 · 6.5 kW)
  4. N ANDOVER STATION 2 — North Andover, MA, 01845 (ChargePoint Network · Level 2 · 6.5 kW)
  5. N ANDOVER SENIOR CNTR 2+3 — North Andover, MA, 01845 (ChargePoint Network · Level 2 · 6.5 kW)
  6. N ANDOVER STATION 1 — North Andover, MA, 01845 (ChargePoint Network · Level 2 · 6.5 kW)
  7. N ANDOVER SCHOOL ADMN 1+2 — North Andover, MA, 01845 (ChargePoint Network · Level 2 · 6.5 kW)
  8. N ANDOVER SENIOR CNTR 1 — North Andover, MA, 01845 (ChargePoint Network · Level 2 · 6.5 kW)
  9. HIGH ST. LOT PARKING GARAGE — North Andover, MA, 01845 (ChargePoint Network · Level 2 · 6.5 kW)
  10. N ANDOVER POLICE DEPT 1 — North Andover, MA, 01845 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For North Andover specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in North Andover, Massachusetts?
There are 10 public electric vehicle charging locations in North Andover, Massachusetts, with a combined 23 individual chargers. 0 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in North Andover?
ChargePoint Network operates the most public charging locations in North Andover with 8 sites, followed by Non-Networked with 1 sites.
How much does it cost to install an EV charger in North Andover?
Level 2 EV chargers in North Andover typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in North Andover?
Most North Andover projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in North Andover?
A typical commercial Level 2 installation in North Andover energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in North Andover take to become profitable?
Payback in North Andover depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.