Install EV Chargers in Lawrence, Massachusetts

Install EV chargers or analyze a site in Lawrence, Massachusetts. 22 existing public charging locations (2 DC fast, 20 Level 2). Free 0–100 profitability score on any Lawrence address from EV Data Map by Charge Rigs.

Lawrence, Massachusetts is served by 22 public electric vehicle charging locations operating 71 individual chargers — an average of 3.2 chargers per site. Of those locations, 2 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 20 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lawrence is ChargePoint Network with 15 locations, followed by AMPUP with 2. Average DC fast power across the city is approximately 185 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lawrence and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lawrence

Lawrence, Massachusetts stands out in the EV charging landscape with a significant reliance on ChargePoint Network, which controls 68% of the city’s 22 public charging locations. This concentration affects network reliability and pricing, making it essential for operators to consider competitive strategies. The city features two DC fast charging sites averaging 185 kW, with one reaching an impressive 250 kW, reflecting a strong infrastructure capable of serving high-demand drivers. Notably, half of the DC fast sites are equipped with 150 kW-class chargers or more, allowing new entrants to leverage the local power curve by installing chargers in the 150–350 kW range. This hybrid mix of fast and Level 2 charging options provides strategic opportunities for growth in a developing market.

Lawrence charging by the numbers

Locations
22
Chargers
71
DC Fast locations
2
Level 2 locations
20

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 3.2. Average DC fast power: 185 kW.

Lawrence charging — local snapshot

Top operator share
ChargePoint Network runs 68% of public locations across 6 networks.
Average DC fast power
185 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 22 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Lawrence

The following operators run public charging in Lawrence, ranked by number of locations.

Featured charging locations in Lawrence

A selection of higher-power public charging locations across Lawrence, sorted by power level.

  1. Lawrence, MA - Tesla Supercharger — Lawrence, MA, 01843 (Tesla · DC Fast · 250 kW)
  2. Fermin Family LLC — Lawrence, MA, 01843 (RED_E · DC Fast · 120 kW)
  3. NE Lawrence — Lawrence, MA, 01843 (AMPUP · Level 2 · 7.2 kW)
  4. ACS Development Corporation — Lawrence, MA, 01843 (AMPUP · Level 2 · 7.2 kW)
  5. 282PAVILION RIVERWALK ST #5 — Lawrence, MA, 01843 (ChargePoint Network · Level 2 · 6.5 kW)
  6. MVRTA GARAGES MCGOVERN 2 — Lawrence, MA, 01843 (ChargePoint Network · Level 2 · 6.5 kW)
  7. INDUSPADCHARGER STATION 1 — Lawrence, MA, 01841 (ChargePoint Network · Level 2 · 6.5 kW)
  8. INDUSPADCHARGER STATION 4 — Lawrence, MA, 01841 (ChargePoint Network · Level 2 · 6.5 kW)
  9. 282PAVILION RIVERWALK ST #2 — Lawrence, MA, 01843 (ChargePoint Network · Level 2 · 6.5 kW)
  10. 282PAVILION RIVERWALK ST #1 — Lawrence, MA, 01843 (ChargePoint Network · Level 2 · 6.5 kW)
  11. 141 WINTHROP BULGER 4 — Lawrence, MA, 01843 (ChargePoint Network · Level 2 · 6.5 kW)
  12. 282PAVILION RIVERWALK ST #6 — Lawrence, MA, 01843 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lawrence specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 20 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lawrence, Massachusetts?
There are 22 public electric vehicle charging locations in Lawrence, Massachusetts, with a combined 71 individual chargers. 2 locations offer DC fast charging and 20 provide Level 2 charging.
What is the largest EV charging network in Lawrence?
ChargePoint Network operates the most public charging locations in Lawrence with 15 sites, followed by AMPUP with 2 sites.
How much does it cost to install an EV charger in Lawrence?
Level 2 EV chargers in Lawrence typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lawrence?
Most Lawrence projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lawrence?
A typical commercial Level 2 installation in Lawrence energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lawrence take to become profitable?
Payback in Lawrence depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.