Install EV Chargers in Grants Pass, Oregon

Install EV chargers or analyze a site in Grants Pass, Oregon. 16 existing public charging locations (5 DC fast, 11 Level 2). Free 0–100 profitability score on any Grants Pass address from EV Data Map by Charge Rigs.

Grants Pass, Oregon is served by 16 public electric vehicle charging locations operating 53 individual chargers — an average of 3.3 chargers per site. Of those locations, 5 (31%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (69%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Grants Pass is ChargePoint Network with 4 locations, followed by FLO with 4. Average DC fast power across the city is approximately 184 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Grants Pass and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Grants Pass

Grants Pass features a robust public charging ecosystem with 16 locations operated by eight distinct networks, offering an appealing blend of choice and competition. The city's DC fast charging sites, averaging 184 kW and with 60% rated at 150 kW or more, position it as a destination for those seeking rapid energy replenishment. With the fastest stall reaching an impressive 350 kW, drivers can select chargers based on power preferences and amenities rather than brand loyalty. ChargePoint Network leads the market with 25% of the sites, ensuring a strong presence among the diverse selection. This variety emphasizes the potential for strategic site development, catering to the nuanced needs of EV users while balancing competitive pricing and functionality in Grants Pass.

Grants Pass charging by the numbers

Locations
16
Chargers
53
DC Fast locations
5
Level 2 locations
11

DC fast share: 31% of locations. Level 2 share: 69%. Average chargers per site: 3.3. Average DC fast power: 184 kW.

Grants Pass charging — local snapshot

Top operator share
ChargePoint Network runs 25% of public locations across 8 networks.
Average DC fast power
184 kW (fastest stall: 350 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
31% DC fast / 69% Level 2 across 16 locations
Estimated DC ports
31 fast-charging ports city-wide

Charging networks in Grants Pass

The following operators run public charging in Grants Pass, ranked by number of locations.

Featured charging locations in Grants Pass

A selection of higher-power public charging locations across Grants Pass, sorted by power level.

  1. Walmart 1834 (Grants Pass, OR) — Grants Pass, OR, 97526 (Electrify America · DC Fast · 350 kW)
  2. WinCo Grants Pass - Tesla Supercharger — Grants Pass, OR, 97526 (Tesla · DC Fast · 250 kW)
  3. Black Bear Diner Grants Pass - Tesla Supercharger — Grants Pass, OR, 97526 (Tesla · DC Fast · 150 kW)
  4. Mocks Ford Sales — Grants Pass, OR, 97526 (FORD_CHARGE · DC Fast · 120 kW)
  5. WCEH Grants Pass — Grants Pass, OR, 97526 (EVCS · DC Fast · 50 kW)
  6. 3 HOURS FREE - City of Grants Pass Location 2 — Grants Pass, OR, 97526 (Blink Network · Level 2 · 21.6 kW)
  7. 3 HOURS FREE - City of Grants Pass Location 1 — Grants Pass, OR, 97526 (Blink Network · Level 2 · 21.6 kW)
  8. JOCO FAC DIMMICK CAMPUS — Grants Pass, OR, 97526 (ChargePoint Network · Level 2 · 19.2 kW)
  9. Schroeder Park — Grants Pass, OR, 97527 (FLO · Level 2 · 19.2 kW)
  10. Tom Pearce County Park — Grants Pass, OR, 97526 (FLO · Level 2 · 19.2 kW)
  11. Grants Pass Airport — Grants Pass, OR, 97526 (FLO · Level 2 · 19.2 kW)
  12. Josephine Fairgrounds — Grants Pass, OR, 97527 (FLO · Level 2 · 19.2 kW)

Nearby cities with EV charging coverage

Other cities in Oregon we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Grants Pass specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Grants Pass, Oregon?
There are 16 public electric vehicle charging locations in Grants Pass, Oregon, with a combined 53 individual chargers. 5 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Grants Pass?
ChargePoint Network operates the most public charging locations in Grants Pass with 4 sites, followed by FLO with 4 sites.
How much does it cost to install an EV charger in Grants Pass?
Level 2 EV chargers in Grants Pass typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Grants Pass?
Most Grants Pass projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Oregon state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Grants Pass?
A typical commercial Level 2 installation in Grants Pass energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Grants Pass take to become profitable?
Payback in Grants Pass depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage