Install EV Chargers in Cedar City, Utah

Install EV chargers or analyze a site in Cedar City, Utah. 14 existing public charging locations (5 DC fast, 9 Level 2). Free 0–100 profitability score on any Cedar City address from EV Data Map by Charge Rigs.

Cedar City, Utah is served by 14 public electric vehicle charging locations operating 67 individual chargers — an average of 4.8 chargers per site. Of those locations, 5 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cedar City is Tesla Destination with 4 locations, followed by Blink Network with 4. Average DC fast power across the city is approximately 257 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cedar City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cedar City

Cedar City's EV charging infrastructure stands out with its competitive blend of 14 public charging locations, showcasing a diverse array of 5 distinct operators, including a significant percentage from Tesla Destination. This variety ensures competitive pricing and uptime, while drivers can choose from an impressive selection of ultra-fast DC fast chargers, averaging 257 kW, with the fastest reaching 350 kW. Remarkably, every DC fast site is rated 150 kW-class or higher, catering to the increasing demand for rapid charging. With 36% of the public ports dedicated to DC fast charging, the balance with Level 2 options positions Cedar City as a keenly accessible hub for both quick stops and longer stays, offering a comprehensive range of amenities for EV users.

Cedar City charging by the numbers

Locations
14
Chargers
67
DC Fast locations
5
Level 2 locations
9

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 4.8. Average DC fast power: 257 kW.

Cedar City charging — local snapshot

Top operator share
Tesla Destination runs 29% of public locations across 5 networks.
Average DC fast power
257 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 14 locations
Estimated DC ports
42 fast-charging ports city-wide

Charging networks in Cedar City

The following operators run public charging in Cedar City, ranked by number of locations.

Featured charging locations in Cedar City

A selection of higher-power public charging locations across Cedar City, sorted by power level.

  1. Walmart 1438 (Cedar City, UT) — Cedar City, UT, 84720 (Electrify America · DC Fast · 350 kW)
  2. Culver's - Tesla Supercharger — Cedar City, UT, 84720 (Tesla · DC Fast · 325 kW)
  3. Travel Plaza II - Tesla Supercharger — Cedar City, UT, 84720 (Tesla · DC Fast · 250 kW)
  4. Stellantis — Cedar City, UT, 84721 (Blink Network · DC Fast · 180 kW)
  5. Cedar City Motor Company - DCFC — Cedar City, UT, 84721 (Blink Network · DC Fast · 180 kW)
  6. Cedar City Motor Company - Series — Cedar City, UT, 84721 (Blink Network · Level 2 · 16.6 kW)
  7. Stellantis - Series — Cedar City, UT, 84721 (Blink Network · Level 2 · 8.3 kW)
  8. Best Western Plus Cedar City - Tesla Destination — Cedar City, UT, 84720 (Tesla Destination · Level 2 · 7.2 kW)
  9. Abbey Inn Cedar City - Tesla Destination — Cedar City, UT, 84721 (Tesla Destination · Level 2 · 7.2 kW)
  10. Comfort Inn & Suites - Cedar City - Tesla Destination — Cedar City, UT, 84720 (Tesla Destination · Level 2 · 7.2 kW)
  11. Motel 6 Cedar City - Tesla Destination — Cedar City, UT, 84720 (Tesla Destination · Level 2 · 7.2 kW)
  12. SCO CCH1 — Cedar City, UT, 84721 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Utah we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cedar City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cedar City, Utah?
There are 14 public electric vehicle charging locations in Cedar City, Utah, with a combined 67 individual chargers. 5 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Cedar City?
Tesla Destination operates the most public charging locations in Cedar City with 4 sites, followed by Blink Network with 4 sites.
How much does it cost to install an EV charger in Cedar City?
Level 2 EV chargers in Cedar City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cedar City?
Most Cedar City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Utah state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cedar City?
A typical commercial Level 2 installation in Cedar City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cedar City take to become profitable?
Payback in Cedar City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage