Install EV Chargers in Provo, Utah

Install EV chargers or analyze a site in Provo, Utah. 41 existing public charging locations (11 DC fast, 30 Level 2). Free 0–100 profitability score on any Provo address from EV Data Map by Charge Rigs.

Provo, Utah is served by 41 public electric vehicle charging locations operating 88 individual chargers — an average of 2.1 chargers per site. Of those locations, 11 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 30 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Provo is ChargePoint Network with 37 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 169 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Provo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Provo

Provo, Utah boasts a robust EV charging infrastructure dominated by the ChargePoint Network, which operates 90% of the city’s 41 public charging stations. With 11 DC fast charging locations averaging 169 kW and featuring a peak output of 250 kW, the city is well-equipped to meet the demands of fast-charging EV drivers. Notably, 45% of these DC fast sites offer 150 kW-class capabilities or higher, positioning their networks competitively in the region. The mix of 27% DC fast chargers alongside 30 Level 2 stations highlights the strategic balance between quick top-ups and longer-stay charging solutions, making Provo an attractive option for both users and site developers looking to maximize uptime and accessibility in this growing market.

Provo charging by the numbers

Locations
41
Chargers
88
DC Fast locations
11
Level 2 locations
30

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 2.1. Average DC fast power: 169 kW.

Provo charging — local snapshot

Top operator share
ChargePoint Network runs 90% of public locations across 4 networks.
Average DC fast power
169 kW (fastest stall: 250 kW)
High-power share
45% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 41 locations
Estimated DC ports
26 fast-charging ports city-wide

Charging networks in Provo

The following operators run public charging in Provo, ranked by number of locations.

Featured charging locations in Provo

A selection of higher-power public charging locations across Provo, sorted by power level.

  1. VOLVO CAR USA PROVO DC3 — Provo, UT, 84601 (ChargePoint Network · DC Fast · 250 kW)
  2. Sleep Inn Provo - Tesla Supercharger — Provo, UT, 84606 (Tesla · DC Fast · 250 kW)
  3. VOLVO CAR USA PROVO DC4 — Provo, UT, 84601 (ChargePoint Network · DC Fast · 250 kW)
  4. VOLVO CAR USA PROVO DC2 — Provo, UT, 84601 (ChargePoint Network · DC Fast · 250 kW)
  5. VOLVO CAR USA PROVO DC1 — Provo, UT, 84601 (ChargePoint Network · DC Fast · 250 kW)
  6. SKY FORD PROVO LVL 3-3 — Provo, UT, 84604 (ChargePoint Network · DC Fast · 120 kW)
  7. SKY FORD PROVO LVL 3-1 PL — Provo, UT, 84604 (ChargePoint Network · DC Fast · 120 kW)
  8. SKY FORD PROVO LVL 3-2 — Provo, UT, 84604 (ChargePoint Network · DC Fast · 120 kW)
  9. SKY FORD PROVO LVL 3-4 — Provo, UT, 84604 (ChargePoint Network · DC Fast · 120 kW)
  10. PROVOAIRPORT DCFAST CHARGE 1 — Provo, UT, 84601 (ChargePoint Network · DC Fast · 62.5 kW)
  11. PROVOAIRPORT DCFAST CHARGE 2 — Provo, UT, 84601 (ChargePoint Network · DC Fast · 62.5 kW)
  12. Vivint — Provo, UT, 84604 (Non-Networked · Level 2 · 8 kW)

Nearby cities with EV charging coverage

Other cities in Utah we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Provo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 11 DC fast and 30 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Provo, Utah?
There are 41 public electric vehicle charging locations in Provo, Utah, with a combined 88 individual chargers. 11 locations offer DC fast charging and 30 provide Level 2 charging.
What is the largest EV charging network in Provo?
ChargePoint Network operates the most public charging locations in Provo with 37 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in Provo?
Level 2 EV chargers in Provo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Provo?
Most Provo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Utah state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Provo?
A typical commercial Level 2 installation in Provo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Provo take to become profitable?
Payback in Provo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.