Install EV Chargers in Orem, Utah

Install EV chargers or analyze a site in Orem, Utah. 37 existing public charging locations (6 DC fast, 31 Level 2). Free 0–100 profitability score on any Orem address from EV Data Map by Charge Rigs.

Orem, Utah is served by 37 public electric vehicle charging locations operating 74 individual chargers — an average of 2.0 chargers per site. Of those locations, 6 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 31 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Orem is ChargePoint Network with 29 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 146 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Orem and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Orem

Orem, Utah showcases a striking concentration of public charging infrastructure, with ChargePoint Network managing 78% of the 37 locations in the city. This reliance on a single operator enhances network reliability and influences user experiences related to uptime and pricing. Among the 6 DC fast charging sites, the average output of 146 kW indicates a competitive landscape, particularly as 33% of these chargers exceed the 150 kW threshold, positioning them attractively for EV drivers. With 16% of the charging outlets designated as DC fast and the fastest site reaching 350 kW, there is a clear opportunity for new operators to capture local demand by deploying high-power charging solutions, especially in a market where Level 2 stations primarily cater to longer-dwell requirements.

Orem charging by the numbers

Locations
37
Chargers
74
DC Fast locations
6
Level 2 locations
31

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.0. Average DC fast power: 146 kW.

Orem charging — local snapshot

Top operator share
ChargePoint Network runs 78% of public locations across 7 networks.
Average DC fast power
146 kW (fastest stall: 350 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 37 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Orem

The following operators run public charging in Orem, ranked by number of locations.

Featured charging locations in Orem

A selection of higher-power public charging locations across Orem, sorted by power level.

  1. RMP Midtown 360 (Orem, UT) — Orem, UT, 84058 (Electrify America · DC Fast · 350 kW)
  2. Orem, UT - Tesla Supercharger — Orem, UT, 84058 (Tesla · DC Fast · 250 kW)
  3. Ken Garff Nissan - Orem — Orem, UT, 84058 (Non-Networked · DC Fast · 100 kW)
  4. CC STATION1 OREM CITY DC 2 — Orem, UT, 84057 (ChargePoint Network · DC Fast · 62.5 kW)
  5. CC STATION1 OREM CITY DC 1 — Orem, UT, 84057 (ChargePoint Network · DC Fast · 62.5 kW)
  6. CC STATION1 OREM CITY DC 4 — Orem, UT, 84057 (ChargePoint Network · DC Fast · 50 kW)
  7. OMAZDAEV NEVS — Orem, UT, 84058 (ChargePoint Network · Level 2 · 12 kW)
  8. SOAPSTONE_1371 1371_27850_S — Orem, UT, 84058 (ChargePoint Network · Level 2 · 12 kW)
  9. SOAPSTONE_1371 1371_52623_N — Orem, UT, 84058 (ChargePoint Network · Level 2 · 12 kW)
  10. OMAZDAEV SEVS — Orem, UT, 84058 (ChargePoint Network · Level 2 · 12 kW)
  11. STATE OF UTAH UDOT OREM 3 — Orem, UT, 84057 (ChargePoint Network · Level 2 · 9.6 kW)
  12. STATE OF UTAH UDOT OREM 2 — Orem, UT, 84057 (ChargePoint Network · Level 2 · 9.6 kW)

Nearby cities with EV charging coverage

Other cities in Utah we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Orem specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 31 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Orem, Utah?
There are 37 public electric vehicle charging locations in Orem, Utah, with a combined 74 individual chargers. 6 locations offer DC fast charging and 31 provide Level 2 charging.
What is the largest EV charging network in Orem?
ChargePoint Network operates the most public charging locations in Orem with 29 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Orem?
Level 2 EV chargers in Orem typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Orem?
Most Orem projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Utah state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Orem?
A typical commercial Level 2 installation in Orem energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Orem take to become profitable?
Payback in Orem depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage