Install EV chargers or analyze a site in Orem, Utah. 37 existing public charging locations (6 DC fast, 31 Level 2). Free 0–100 profitability score on any Orem address from EV Data Map by Charge Rigs.
Orem, Utah is served by 37 public electric vehicle charging locations operating 74 individual chargers — an average of 2.0 chargers per site. Of those locations, 6 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 31 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Orem is ChargePoint Network with 29 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 146 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Orem and receive an instant ROI score, demand projection, and recommended charger configuration.
Orem, Utah offers a distinctive charging landscape with a significant reliance on the ChargePoint Network, which operates 78% of the 37 public charging locations. The robust presence of DC fast charging, comprising 16% of the total sites, averages 146 kW, while one location peaks at an impressive 350 kW. Notably, one-third of the DC fast stations fall into the 150 kW-class or higher, attracting EV drivers who prioritize rapid charging. With a combination of both Level 2 and DC fast options catering to various user needs, site developers must consider this concentrated network infrastructure as they evaluate opportunities for new installations, especially to meet the growing demand for higher power offerings in the local market.
DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.0. Average DC fast power: 146 kW.
The following operators run public charging in Orem, ranked by number of locations.
A selection of higher-power public charging locations across Orem, sorted by power level.
Other cities in Utah we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Orem specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 31 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.